{"id":238,"date":"2026-11-23T16:15:34","date_gmt":"2026-11-23T07:15:34","guid":{"rendered":"https:\/\/groo.im\/blog\/?p=238"},"modified":"2026-11-23T16:15:34","modified_gmt":"2026-11-23T07:15:34","slug":"groon-weekly-2026-11-23-ev-charger-migration-en","status":"publish","type":"post","link":"https:\/\/groo.im\/blog\/en\/groon-weekly-2026-11-23-ev-charger-migration-en\/","title":{"rendered":"Can You Keep Your Existing EV Chargers When You Switch CSMS?"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1440\" height=\"811\" src=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-cover.webp\" alt=\"A yellow EV plugged into a teal charger beside a battery character holding a migration checklist\" class=\"wp-image-235\" srcset=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-cover.webp 1440w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-cover-300x169.webp 300w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-cover-1024x577.webp 1024w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-cover-768x433.webp 768w\" sizes=\"auto, (max-width: 1440px) 100vw, 1440px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Yes, if your chargers can communicate with the new charging station management system (CSMS) and their connection settings can be changed. To decide which chargers can stay, check the exact model and firmware in service. Even chargers of the same model may run different versions of the software installed on them. <a href=\"https:\/\/openchargealliance.org\/wp-content\/uploads\/2025\/11\/migrating_charging_stations-v10-1.pdf#page=6\" target=\"_blank\" rel=\"noopener noreferrer\">Open Charge Alliance charger migration guide<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What should you check on each charger?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">List the manufacturer, model and firmware version for each charger. If it uses OCPP, record the version it runs. OCPP is the communication protocol chargers use to exchange information such as status and session data with a management system. Check that the new system supports the version and functions you rely on. Find out who can change the server address and security settings. Depending on the charger, you may need help from the manufacturer or existing operator, or someone may have to make the change on site. <a href=\"https:\/\/openchargealliance.org\/protocols\/open-charge-point-protocol\/\" target=\"_blank\" rel=\"noopener noreferrer\">Open Charge Alliance overview of OCPP<\/a> \u00b7 <a href=\"https:\/\/openchargealliance.org\/wp-content\/uploads\/2025\/11\/migrating_charging_stations-v10-1.pdf#page=6\" target=\"_blank\" rel=\"noopener noreferrer\">Connection settings by charger model<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Which records should you move or archive?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Ask what you can export and how far back the records go before access to the old system ends. Open a few sample sessions and check whether each record includes the charger ID, start and stop times, energy delivered in kWh and the tariff applied. Confirm separately which export formats the new system can read. Agree on which records to import for day-to-day operations and which to keep in a readable archive for past customer inquiries or settlement checks. <a href=\"https:\/\/openchargealliance.org\/wp-content\/uploads\/2025\/11\/migrating_charging_stations-v10-1.pdf#page=7\" target=\"_blank\" rel=\"noopener noreferrer\">Open Charge Alliance guidance on transferring data<\/a> \u00b7 <a href=\"https:\/\/www.evconnect.com\/services\/network-migration\/\" target=\"_blank\" rel=\"noopener noreferrer\">EV Connect migration guidance<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"380\" height=\"348\" src=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-sticker-records.webp\" alt=\"An orange battery character holding charging records\" class=\"wp-image-234\" style=\"width:220px;height:auto\" srcset=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-sticker-records.webp 380w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-sticker-records-300x275.webp 300w\" sizes=\"auto, (max-width: 380px) 100vw, 380px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Run a full charging session on a few chargers first<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Pick a small group that represents the main model and firmware combinations you operate. Once they are connected, authorize a driver the way you normally would and start and finish a charge. Check that the new system receives status and meter readings and that the completed session shows the expected record and tariff. If your team uses remote stop, check that the charger actually stops when asked. If driver authorization or session reporting fails after the charger connects, identify the cause and how to recover before moving on to the next site. <a href=\"https:\/\/openchargealliance.org\/wp-content\/uploads\/2025\/11\/migrating_charging_stations-v10-1.pdf#page=7\" target=\"_blank\" rel=\"noopener noreferrer\">Open Charge Alliance guidance on staged migrations<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"380\" height=\"374\" src=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-sticker-test.webp\" alt=\"A teal charger character holding up a checkmark\" class=\"wp-image-236\" style=\"width:220px;height:auto\" srcset=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-sticker-test.webp 380w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-sticker-test-300x295.webp 300w\" sizes=\"auto, (max-width: 380px) 100vw, 380px\" \/><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">Related reading \u00b7 <a href=\"https:\/\/groo.im\/blog\/en\/groon-weekly-2026-11-23-ev-charger-offline-en\/\" target=\"_blank\" rel=\"noopener noreferrer\">Why does an EV charger show as offline when it still has power?<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Planning a switch? The <a href=\"https:\/\/groo.im\/en\/ev\/#migration-checklist\" target=\"_blank\" rel=\"noopener noreferrer\">GROO EV CSMS migration checklist<\/a> covers your chargers, connection settings, records, test sessions and recovery. Use \u2018Chat with us\u2019 at the bottom right to ask about the chargers you operate.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>You can keep your installed EV chargers if they work with the new management system and their connection settings can be changed. Check charger settings, charging and meter records, and test criteria before you switch.<\/p>\n","protected":false},"author":1,"featured_media":235,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[20],"tags":[],"class_list":["post-238","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-charging-tips"],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/groon-ev-charger-migration-cover.webp","_links":{"self":[{"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/posts\/238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/comments?post=238"}],"version-history":[{"count":2,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/posts\/238\/revisions"}],"predecessor-version":[{"id":241,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/posts\/238\/revisions\/241"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/media\/235"}],"wp:attachment":[{"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/media?parent=238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/categories?post=238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/tags?post=238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}