{"id":124,"date":"2026-11-16T08:53:19","date_gmt":"2026-11-15T23:53:19","guid":{"rendered":"https:\/\/groo.im\/blog\/?p=124"},"modified":"2026-11-16T09:22:00","modified_gmt":"2026-11-16T00:22:00","slug":"groon-weekly-2026-11-16-energy-news-en","status":"publish","type":"post","link":"https:\/\/groo.im\/blog\/en\/groon-weekly-2026-11-16-energy-news-en\/","title":{"rendered":"Energy news: November 2026, week 3"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-03.png\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" width=\"1672\" height=\"941\" src=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-03.png\" alt=\"Energy Brief editorial cover for Korea and world energy news, November 2026, week 3\" class=\"wp-image-126\" srcset=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-03.png 1672w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-03-300x169.png 300w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-03-1024x576.png 1024w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-03-768x432.png 768w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-03-1536x864.png 1536w\" sizes=\"auto, (max-width: 1672px) 100vw, 1672px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Coverage: November 9, 2026, 07:05\u2013November 16, 2026, 07:05 KST<br>Reviewed: November 16, 2026<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This edition examines the costs and infrastructure needed to maintain electricity supply. In South Korea, KEPCO\u2019s results highlight pressure on power procurement costs and funding for grid investment. In the United States, a new order keeps a specific power plant available to address winter supply risks.<\/p>\n\n\n\n<div class=\"wp-block-group has-border-color\" style=\"border-color:#dce7e6;border-style:solid;border-width:1px;border-radius:12px;margin-top:24px;margin-bottom:24px;padding-top:24px;padding-right:24px;padding-bottom:24px;padding-left:24px\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n\n<h2 class=\"wp-block-heading\">South Korea: Funding the grid as procurement costs rise<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">KEPCO reported consolidated operating profit of KRW 6.5569 trillion for January\u2013September on November 12, down 43.2% from a year earlier. It remained profitable, but higher electricity supply costs reduced its financial headroom. These figures cover nine months, rather than the third quarter alone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to KEPCO\u2019s own press release, both fuel costs at its generating subsidiaries and payments for electricity from private generators increased. Purchases from private generators fell in volume, but costs rose, partly because of higher liquefied natural gas prices. KEPCO said it was cutting costs and adjusting investment priorities to secure grid funding and reduce pressure for tariff increases.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">KEPCO needs to secure funding for grid investment while limiting pressure to raise electricity tariffs. However, higher costs for the electricity it purchases do not automatically increase the bills paid by facilities or charging sites. This results announcement did not include a decision to change tariffs. If tariff adjustments are announced, operators will need to assess the impact on their bills using the tariff and contract terms that apply to them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sources: <a href=\"https:\/\/www.newswire.co.kr\/newsRead.php?no=1047077\" target=\"_blank\" rel=\"noopener noreferrer\">KEPCO-issued results release, November 12, 2026<\/a> \u00b7 <a href=\"https:\/\/www.electimes.com\/news\/articleView.html?idxno=374700\" target=\"_blank\" rel=\"noopener noreferrer\">Electimes results coverage, November 12, 2026<\/a><\/p>\n\n\n\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group has-border-color\" style=\"border-color:#dce7e6;border-style:solid;border-width:1px;border-radius:12px;margin-top:24px;margin-bottom:24px;padding-top:24px;padding-right:24px;padding-bottom:24px;padding-left:24px\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n\n<h2 class=\"wp-block-heading\">United States: Extending plant availability for winter<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">On November 13, the US Department of Energy issued an emergency order concerning the coal-fired J.H. Campbell plant in Michigan. It requires regional grid operator MISO and utility Consumers Energy to keep the plant available to operate from November 15 through February 12, 2027. It follows an earlier order issued on August 14 that applied through November 14.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">DOE\u2019s November 14 explanation cited winter grid reliability. Keeping the plant available does not mean running it continuously at full output: the order calls for cost-conscious dispatch only during the hours needed to meet the emergency. Maintaining a facility and deciding when it generates are distinct decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Last edition\u2019s discussion of PJM\u2019s winter outlook concerned a different grid and a different type of action. The MISO order cannot be taken as a statement of uniform supply conditions across the United States. In GROON\u2019s assessment, it illustrates a winter-planning focus on whether capacity can operate when needed, as well as how its costs are managed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Primary sources: <a href=\"https:\/\/www.energy.gov\/documents\/doe-order-no-202-26-51\" target=\"_blank\" rel=\"noopener noreferrer\">DOE Order No. 202-26-51, November 13, 2026<\/a> \u00b7 <a href=\"https:\/\/www.energy.gov\/articles\/energy-secretary-keeps-critical-coal-fired-generation-operational-ahead-winter-midwest\" target=\"_blank\" rel=\"noopener noreferrer\">DOE explanation, November 14, 2026<\/a><br>Background: <a href=\"https:\/\/www.energy.gov\/ceser\/federal-power-act-section-202c-midcontinent-independent-system-operator-miso-order-no-202-1\" target=\"_blank\" rel=\"noopener noreferrer\">Previous Order No. 202-26-39, August 14, 2026<\/a><\/p>\n\n\n\n<\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Next developments to watch are separate Korean tariff and investment announcements, MISO\u2019s required implementation submission by November 28, and any subsequently published cost-recovery proceedings under the US order.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Related reading: <a href=\"https:\/\/groo.im\/blog\/en\/groon-weekly-2026-11-09-energy-news-en\/\" target=\"_blank\" rel=\"noopener noreferrer\">Energy news: November 2026, week 2<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-medium\"><a href=\"https:\/\/groo.im\/blog\/en\/groon-weekly-2026-11-09-energy-news-en\/\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"169\" src=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-02-300x169.webp\" alt=\"Energy Brief, November 2026, week 2 \u2014 read the previous edition\" class=\"wp-image-64\" srcset=\"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-02-300x169.webp 300w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-02-1024x576.webp 1024w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-02-768x432.webp 768w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-02-1536x864.webp 1536w, https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-02.webp 1600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Information about demand response operations software is available on the <a href=\"https:\/\/groo.im\/en\/dr\/\" target=\"_blank\" rel=\"noopener noreferrer\">GROO DR page<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For enquiries about adopting operations software, use the Chat with us button at the bottom right.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KEPCO\u2019s procurement costs and grid funding, alongside a US order extending Campbell plant availability: what changed, what is in force and what to watch next.<\/p>\n","protected":false},"author":1,"featured_media":126,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":true,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[27],"tags":[],"class_list":["post-124","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/groo.im\/blog\/wp-content\/uploads\/2026\/11\/energy-brief-2026-11-week-03.png","_links":{"self":[{"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/posts\/124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/comments?post=124"}],"version-history":[{"count":5,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/posts\/124\/revisions"}],"predecessor-version":[{"id":134,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/posts\/124\/revisions\/134"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/media\/126"}],"wp:attachment":[{"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/media?parent=124"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/categories?post=124"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/groo.im\/blog\/wp-json\/wp\/v2\/tags?post=124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}